Grand Egyptian Museum
Supply and installation of GE busway and Piller UPS.
Grand Egyptian Museum
Scope of Work & Execution
Electrical Substations, Grand Egyptian Museum – Supply, installation, testing and commissioning of GE busway systems within the electrical substations, including copper busbar modifications and the interconnection between busbars, power transformers and low-voltage switchgear.
Project Gallery
Project Overview
- Client Grand Egyptian Museum
- Category Governmental
- Main Contractor Orascom Construction
- Start Date 2002
- Completion Date 2005
- Location Cairo-Alexandria Desert Rd, Kafr Nassar, Al Haram, Giza Governorate, Egypt, Egypt
Need a Similar Solution?
Consult our engineering team for technical evaluations or tender inquiries.
Inquire About This Project500+
Engineered for Uptime, Built for Scale
From custom switchgear assembly to turnkey LV/MV electrical contracting, we deliver robust infrastructure solutions backed by 24/7 SLA maintenance.
Empowering Industry Leaders Through Strategic Collaboration
We build enduring partnerships grounded in trust, delivering robust, high-performance solutions engineered to power growth and operational excellence.
'Built on Trust. Driven by Engineering Excellence.'















